Pressurised Spray and Drying Enclosures with Water Curtain

ALWO pressurised painting enclosures with water-curtain filtration provide separate rooms for spraying and part drying, with mechanical supply and extract air. Pressure and temperature are controlled for the process, and incoming air is filtered before distribution.

Two process zones

The standard configuration includes a spray room and a drying room separated by a partition with glazed sliding doors. The enclosure is constructed from 40 mm polyurethane sandwich panels.

Main components

  • ALWO W30, W40 or W50 water-curtain extraction wall selected according to enclosure width;
  • water floor with metal grating and fill/drain valves, without water recirculation;
  • partition with two glazed sliding doors, each 1250 × H2400 mm, between spraying and drying;
  • glazed access doors measuring 2000 × H2400 mm for the spraying and drying rooms;
  • 1200 mm, 2 × 36 W, IP65 fluorescent luminaires, distributed along the enclosure;
  • 500 mm-high air-distribution plenum with ceiling filters selected for the required supply-air quality;
  • two vapour-extraction columns for the drying room;
  • two air-handling units, AHU 1 and AHU 2, for make-up air, filtration and heating;
  • PLC electrical and control panel with variable-frequency drive, temperature control, motor protection and timed sequences.

Wet overspray separation

The water curtain is intended to capture paint and coating particulate. It does not, by itself, remove solvent vapours or VOCs; exhaust and any additional treatment stages must be designed for the products being used. Water level and quality, pump, nozzles, internal passages, sludge and contaminated water require an operating and maintenance plan.

Sizing and compliance

Supply and extract airflow, differential pressure, temperature, drying cycle and VOC emissions must be calculated for the process. Hazardous-area classification, electrical equipment, earthing, fire/explosion protection and air discharge are project-specific; IP65 does not automatically provide ATEX compliance.

3D view of an ALWO pressurised spray and drying enclosure with water-curtain filtration

Every configuration below includes the sandwich-panel enclosure, AHU 1 and AHU 2, two vapour-extraction columns and the electrical/control panel.

Enclosure dimensions L × W × H (mm) Water-curtain extraction wall Water floor
3000 × 6000 × 2500 ALWO W30 3 × 3 m
3000 × 9000 × 2500 ALWO W30 3 × 3 m
3000 × 12000 × 2500 ALWO W30 3 × 3 m
4000 × 6000 × 2500 ALWO W40 4 × 3 m
4000 × 9000 × 2500 ALWO W40 4 × 3 m
4000 × 12000 × 2500 ALWO W40 4 × 3 m
5000 × 8000 × 2500 ALWO W50 5 × 3 m
5000 × 10000 × 2500 ALWO W50 5 × 3 m
5000 × 12000 × 2500 ALWO W50 5 × 3 m

These are standard configurations. Air and water flow, heating capacity and control functions are sized for the process.

ALWO enclosures with wet overspray separation

Transparent 3D view of an ALWO enclosure with spraying and drying zones
ALWO enclosure – transparent 3D view
Installed ALWO painting enclosure with wet overspray separation
Installed ALWO water-curtain enclosure
Glazed doors and ductwork of an ALWO pressurised enclosure
ALWO enclosure access and ductwork
Drying room inside an ALWO enclosure with part racks
ALWO drying room
ALWO drying room with air-distribution ductwork and racks
Drying-room air distribution
Water-curtain extraction wall and grated floor inside an ALWO enclosure
ALWO water-curtain spray zone
ALWO spraying zone with wet extraction wall and spray equipment
ALWO spraying area
Interior of an ALWO enclosure with wet extraction wall and grated metal floor
Wet extraction wall and grated floor
Call Now Button